A Snowball's Chance...
A Grizzly Encounter
How to complete Wroggi Place, Wroggi Time¶
This page is a walkthrough for the Quest, Wroggi Place, Wroggi Time. It will navigate you through the necessary steps to successfully defeating Great Wroggi.
The Wroggi Place, Wroggi Time Quest becomes available when you reach 1* Hub Quests.
| Reward | Locale | Time Limit |
|---|---|---|
| 2880z | Shrine Ruins | 50 minutes |
Great Wroggi Location¶
Once you’ve accepted the quest, be sure to consume some delicious Bunny Dango and equip yourself with a Ice based weapon before departing. You’ll be able to find Great Wroggi. in the following locations.
| Area | Chance |
|---|---|
| 6 | 60% |
| 13 | 30% |
| 9 | 10% |
How to defeat Great Wroggi¶
Head to one of the three locations to find Great Wroggi roaming around.
Watch out for Great Wroggi’s poison attacks
Great Wroggi is a Bird Wyvern type monster which was introduced back in Monster Hunter 3 Ultimate. This Monster has a major weakness to Ice. The Great Wroggi relies heavily on its poison attacks to defend itself, so make sure to carry an Antidote or Herbal Medicine to remove the effect if you get caught. For an in-depth strategy to tackling Great Wroggi, refer to our separate Great Wroggi page.

Written by
Shane Williams
Shane has been at Gamer Guides since 2019 where he first joined as a contributor before coming on as an Editor in 2020. He brings an interesting look at all platforms and insight into the world of… More about Shane Williams



No Comments